Encana Corporation

Closed Expressions of Interest:

EOI - ID Issue Date Close DateDescription
REG. SUPPORT Sep 11/00Sep 15/00Regulatory Submission Support for Potential Development Plan Application
PCP-00-001 Sep 1/00Sep 18/00Surface Wellhead System & Services
PCP-00-002 Sep 1/00Sep 18/00Liner Hanger Equipment & Services
PCP-00-003 Sep 1/00Sep 18/00Mudline Suspension Equipment & Services
PCP-00-004 Sep 1/00Sep 18/00Test String
PCP-00-005 Sep 1/00Sep 18/00Jack-up drilling rig
PCP-00-006 Sep 5/00Sep 18/00Cementing Unit, Chemicals & Services
PCP-00-007 Sep 1/00Sep 18/00Offshore supply base
PCP-00-008 Sep 1/00Sep 18/00Snubbing/Stripping Equipment & Services
PCP-00-009 Sep 5/00Sep 18/00Open Hole and Cased Hole Wireline Services
PCP-00-010 Sep 1/00Sep 18/00Mud Logging
PCP-00-011 Sep 5/00Sep 18/00Logging While Drilling ( LWD ) Services
PCP-00-012 Sep 1/00Sep 18/00MWD & Directional Drilling Services
PCP-00-013 Sep 1/00Sep 18/00Gyro Services
PCP-00-014 Sep 1/00Sep 18/00Drilling Fluid Supply & Services
PCP-00-015 Sep 1/00Sep 18/00Centrifuges & Services
PCP-00-016 Sep 1/00Sep 18/00Meteorological and oceanographic services
PCP-00-017 Sep 1/00Sep 18/00Breathing Air System
PCP-00-018 Sep 1/00Sep 18/00Helicopter services
PCP-00-019 Sep 1/00Sep 18/00Offshore support vessels
PCP-00-020 Sep 1/00Sep 18/00Subsea services
PCP-00-021 Sep 1/00Sep 18/00Tong Services
PCP-00-022 Sep 1/00Sep 18/00Fishing Services
PCP-00-023 Sep 1/00Sep 18/00Casing Accessories
PCP-00-024 Sep 1/00Sep 18/00Bucking Services
PCP-00-025 Sep 1/00Sep 18/00Tubular Inspection Service
PCP-00-026 Sep 1/00Sep 18/00Well Testing Equipment & Services
PCP-00-027 Sep 1/00Sep 18/00Subsurface Well Testing Equipment & Services
PCP-00-028 Sep 1/00Sep 18/00Metal fabrication
PCP-00-029 Sep 1/00Sep 18/00Medical services
PCP-00-030 Sep 1/00Sep 18/00Rig positioning services
PCP-00-031 Sep 1/00Sep 18/00Coring Equipment & Services
PCP-00-032 Sep 1/00Sep 18/00Storm Packers
PCP-00-033 Sep 1/00Sep 18/00Stevedoring services
PCP-00-034 Sep 1/00Sep 18/00Crane services
PCP-00-035 Sep 1/00Sep 18/00Waste disposal and recycling services
PCP-00-036 Sep 1/00Sep 18/00Trucking services - long distance
PCP-00-037 Sep 1/00Sep 18/00Trucking services - local
PCP-00-039 Sep 1/00Sep 18/00Offshore container services
PCP-00-040 Sep 1/00Sep 18/00Lifting gear inspection services
PCP-00-041 Sep 1/00Sep 18/00Petroleum products
PCP-00-042 Sep 1/00Sep 18/00Downhole Equipment Rental
PCP-00-038 Dec 4/00Dec 18/00Subsea wellsite survey services
PCP-00-044 Dec 4/00Dec 18/00Household Waste Disposal Services
PCP-00-045 Dec 4/00Dec 18/00Hazardous Waste Disposal Services
PCP-00-046 Dec 4/00Dec 18/00Scrap wire, cable, and metal disposal services
PCP-00-047 Dec 4/00Dec 18/00Vacuum truck services
PCP-2001040 Mar 6/01Mar 12/01Scaffolding Equipment and Services
PCP-2001028 Mar 6/01Mar 13/01Tubular Running Services
PCP-2001029 Mar 6/01Mar 13/01Rig Inspection Services
PCP-2001033 Mar 6/01Mar 13/01Threading Services
PCP-2001043 Mar 6/01Mar 13/01Threading Inspection Services
EOI-2001-041 Mar 5/01Mar 16/01Office Furniture
EOI2001038 Feb 23/01Mar 16/01EOI Reference Number: EOI 2001038
PCP-2001056 Mar 23/01Mar 30/01EOI Reference Number: PCP-2001056
2001058 Mar 26/01Apr 2/01EOI Reference Number: 2001058
2001070 Apr 27/01May 5/01EOI Reference Number: 2001070
PCP 2001-071 Apr 30/01May 14/01Ship Agency and Custom Brokerage
EOI2001074 May 10/01May 24/01EOI Reference Number: EOI2001074
PCP-2001080 May 29/01Jun 11/01Tubular Management Services
PCP-2001087 Jun 6/01Jun 14/01Subsea Wellhead System and Services
2001089 Jun 1/01Jun 15/01EOI Reference Number: 2001089
2001095 Jun 14/01Jun 28/01EOI Reference Number: 2001095
2001098 Jun 18/01Jun 29/01EOI Reference Number: 2001098
2001093 Jul 3/01Jul 12/01EOI Reference Number: 2001093
2001103 Jul 11/01Jul 25/01Automation Systems - Deep Panuke Project
2001107 Aug 3/01Aug 16/01Rig Inspection Services
2001119 Sep 28/01Oct 12/01EOI Reference Number: 2001119
EOI-2001-124 Oct 17/01Oct 31/01Fork Lift Trucks
2001130 Oct 23/01Nov 2/01EOI Reference Number: 2001130
EOI-2001-133 Nov 8/01Nov 22/01Helicopter Fuel Storage and Pumping Unit - Sable Island
N2001001 Nov 27/01Dec 4/01BIDS Categories: 9476, 9145, 8965, 8967
2001141 Dec 4/01Dec 18/01EOI Reference Number: 2001141
2001130 Oct 23/01Jan 4/02EOI Reference Number: 2001130
2002010PK Feb 22/02Mar 8/02EOI Reference Number: 2002010PK
2002016 Feb 26/02Mar 12/02EOI Reference Number: 2002016
EOI-M-01-00 Mar 11/02Mar 23/02SUPPLY OF GAS TURBINE DRIVEN CENTRIFUGAL COMPRESSORS FOR EXPORT AND FEED GAS
EOI-M-02-00 Mar 11/02Mar 23/02SUPPLY OF COMPRESSORS-ACID GAS SYSTEM
EOI-M-14-00 Mar 11/02Mar 23/02SUPPLY OF GAS TURBINE POWER GENERATION PACKAGES
EOI-M-20-01 Mar 11/02Mar 23/02SUPPLY OF AMINE CONTACTOR
EOI-M-32-01 Mar 11/02Mar 23/02SUPPLY OF TEG CONTACTOR
EOI-M-48-00 Mar 11/02Mar 23/02SUPPLY OF ELECTRICALLY-DRIVEN SUBMERSIBLE SEAWATER LIFT PUMPS
EOI-M-54-00 Mar 11/02Mar 23/02SUPPLY OF FIRE WATER PUMP SYSTEM
EOI-S-03-00 Mar 11/02Mar 23/02SUPPLY OF MAJOR DECK STEEL
EOI-E-02-01 Mar 12/02Mar 27/02SUPPLY OF CABLE GLANDS
EOI-L-08-00 Mar 12/02Mar 27/02SUPPLY OF MECHANICAL TYPE CONNECTORS
EOI-M-03-00 Mar 12/02Mar 27/02SUPPLY OF CONDENSATE STABILIZER OVERHEAD COMPRESSOR
2002022 Mar 14/02Mar 28/02EOI Reference Number: 2002022
2002024PK Mar 15/02Mar 29/02EOI Reference Number: 2002024PK
EOI2002027PK Mar 22/02Mar 29/02GEOTECHNICAL & GEOPHYSICAL INVESTIGATION
EOI-M-44-00 Mar 15/02Apr 5/02SUPPLY OF PEDESTAL CRANES
EOI-E-07-01 Mar 22/02Apr 9/02SUPPLY OF JUNCTION BOXES
EOI-I-14-00 Mar 22/02Apr 9/02SUPPLY OF INSTRUMENT TUBING, HEAT TRACED TUBE BUNDLES, AND TUBE FITTINGS
EOI-E-12-00 May 9/02May 24/02SUPPLY OF: Power Switchgear, MCC's, Transformers and Panelboards
M-38-00 May 17/02Jun 3/02SUPPLY OF Plant/Instrument Air Compressor(s) Package w/Dryer
EOI-L-03-00 May 22/02Jun 6/02SUPPLY OF "Alloy and Clad Pipe, Fittings and Flanges"
EOI-M-53-00 May 24/02Jun 6/02SUPPLY OF ELECTRICALLY - DRIVEN CENTRIFUGAL PUMPS
EOI-L-02-00 May 24/02Jun 10/02SUPPLY OF "Stainless Steel Pipe, Fittings and Flanges"
EOI-M-56-00 May 28/02Jun 10/02SUPPLY OF ELECTRICALLY - DRIVEN VERTICAL SUMP PUMPS
EOI-2002-144PK Jun 3/02Jun 14/02SUPPLY OF: WELLHEAD PLATFORM JACKET FABRICATION
EOI-E-08-00 Jun 3/02Jun 14/02SUPPLY OF Electrical Heat Tracing Systems
EOI-L-01-00 Jun 3/02Jun 17/02SUPPLY OF "CARBON STEEL PIPE, FLANGES & FITTINGS"
EOI-M-07-00 Jun 3/02Jun 17/02SUPPLY OF "EXCHANGERS-PCHE-PRINTED CIRCUIT BOARD"
EOI-M-20-02 Jun 3/02Jun 17/02SUPPLY OF "Amine Gas Sweetening System"
EOI-M-21-00 Jun 3/02Jun 17/02SUPPLY OF CHEMICAL INJECTION PACKAGE
EOI-M-32-02 Jun 3/02Jun 17/02SUPPLY OF "TEG REGENERATION SYSTEM"
EOI-M-47-00 Jun 3/02Jun 17/02SUPPLY OF "Produced Water Treatment System"
EOI-M-52-00 Jun 4/02Jun 18/02SUPPLY OF ELECTRICALLY DRIVEN STABILIZED CONDENSATE RE-INJECTION PUMPS
EOI-M-55-00 Jun 4/02Jun 18/02SUPPLY OF ELECTRICALLY DRIVEN POSITIVE DISPLACEMENT PUMPS
EOI2002041PK Jun 4/02Jun 18/02SUPPLY OF: WELLHEAD PLATFORM TOPSIDES FABRICATION
S-02-00/S-04-00 Jun 4/02Jun 19/02SUPPLY OF JACKET PILES AND WELDED TUBULARS & CONES
S-08-00 Jun 6/02Jun 21/02SUPPLY OF STRUCTURAL ROLLED SECTIONS & SEAMLESS TUBULARS
EOI-M-27-00 Jun 11/02Jun 24/02SUPPLY OF Hypochlorite Generation Package
EOI M-42-00 Jun 12/02Jun 26/02SUPPLY OF INERT GAS GENERATION PACKAGE
EOI-I-37-00 Jun 13/02Jun 27/02SUPPLY OF I-37-00 - SUPPLY OF ON-OFF VALVES & SAFETY SHUT-OFF VALVES
EOI-M-48-02 Jun 13/02Jun 28/02SUPPLY OF "SEAWATER FILTRATION SYSTEM"
EOI-M-30-00 Jun 24/02Jul 5/02SUPPLY OF Fuel Gas Package
EOI C2002115PK Jun 24/02Jul 8/02SUPPLY OF: REPROGRAPHIC SERVICES
EOI-L-15-00 Jun 25/02Jul 8/02SUPPLY OF PRODUCTION AND TEST MANIFOLDS
EOI U-04-00 Jul 3/02Jul 17/02SUPPLY OF 24" SUBSEA ISOLATION VALVE (SSIV)
EOI2002040PK Jul 10/02Jul 26/02SUPPLY OF: UTILITY & QUARTERS PLATFORM TOPSIDES DESIGN & FABRICATION
EOI2002043PK Jul 10/02Jul 26/02SUPPLY OF: PRODUCTION PLATFORM JACKET FABRICATION
EOI2002044PK Jul 10/02Jul 26/02SUPPLY OF: UTILITIES AND QUARTERS PLATFORM JACKET FABRICATION
EOI 2002156 Jul 24/02Jul 30/02Description: Geotechnical Testing
2002118PK Jul 22/02Jul 31/02SUPPLY OF PROJECT MANAGEMENT SYSTEM
2002155 Jul 17/02Aug 2/02EOI Reference Number: 2002155
EOI2002042PK Jul 19/02Aug 5/02SUPPLY OF: PRODUCTION PLATFORM TOPSIDES FABRICATION
EOI-2002051 Aug 8/02Aug 21/02SUPPLY OF: FLAREBOOM FABRICATION
EOI2002052 Aug 8/02Aug 21/02SUPPLY OF: BRIDGE FABRICATION
2002162 Aug 21/02Sep 4/02EOI Reference Number: 2002162
EOI 2002167 Sep 11/02Sep 20/02EOI Reference Number: EOI 2002167
EOI2002039PK Sep 10/02Sep 24/02Transport & Installation (T&I)
S-09-00 Sep 9/02Sep 24/02SUPPLY OF STRUCTURAL STEEL CASTINGS
EOI2002038PK Sep 13/02Sep 27/02Offshore Pipelay
EOI2002..... Oct 3/02Oct 17/02SUPPLY OF: JACKET FABRICATION PRODUCTION PLATFORM, WELLHEAD PLATFORM AND UTILITIES AND QUARTERS PLATFORM
EOI2002040PK-A Oct 3/02Oct 17/02SUPPLY OF: UTILITY & QUARTERS PLATFORM TOPSIDES DESIGN & FABRICATION
EOI2002041PK-A Oct 3/02Oct 17/02SUPPLY OF: WELLHEAD PLATFORM TOPSIDES FABRICATION
EOI2002042PK-A Oct 3/02Oct 17/02SUPPLY OF: PRODUCTION PLATFORM TOPSIDES FABRICATION
EOI2002127PK Oct 4/02Oct 18/02SUPPLY OF: FLOW METERING SERVICES - DESIGN
EOI - L-23-00 Oct 4/02Oct 21/02SUPPLY OF VALVES - BALL, METAL AND SOFT SEATED
EOI - L-24-00 Oct 4/02Oct 21/02SUPPLY OF VALVES - BUTTERFLY
EOI-L-37-00 Oct 21/02Nov 4/02SUPPLY OF CLAD/OVERLAY PIPE, FLANGES & FITTINGS
EOI-L-30-00 Oct 25/02Nov 12/02SUPPLY OF VALVES - SAFETY RELIEF (PSV's)
EOI-L-25-02 Oct 29/02Nov 14/02SUPPLY OF GLOBE VALVES (CS, SS, ALLOY, ETC.)
EOI-L-25-03 Oct 29/02Nov 14/02SUPPLY OF CHECK VALVES (CS, SS, ALLOY, ETC.)
EOI-L-25-04 Oct 29/02Nov 14/02SUPPLY OF NON-SLAM CHECK VALVES
2002-211 Nov 8/02Nov 22/02EOI Reference: 2002-211
M-62-00 Nov 12/02Nov 25/02SUPPLY OF PRODUCTION SEPARATORS
EOI2002181PK Nov 15/02Nov 28/02SUPPLY OF: SIL STUDY SERVICES FOR SIS- DESIGN
L-27-00 Nov 15/02Nov 29/02SUPPLY OF Double Block and Bleed Valves
B-03-00 Nov 15/02Dec 2/02SUPPLY OF CUSTOMS CONSULTANT
B-04-00 Nov 15/02Dec 2/02SUPPLY OF CUSTOMS BROKERAGE
B-01-00 Nov 15/02Dec 3/02SUPPLY OF FREIGHT FORWARDING - DOMESTIC NORTH AMERICA
B-02-00 Nov 15/02Dec 3/02SUPPLY OF FREIGHT FORWARDING - INTERNATIONAL
EOI-L-06-00 Nov 19/02Dec 4/02SUPPLY OF STUDBOLTING / NUTS / WASHERS /CAPSCREWS
EOI-I-32-00 Nov 28/02Dec 12/02SUPPLY OF WELLHEAD HYDRAULIC CONTROL PANEL
EOI-I-44-00 Nov 28/02Dec 12/02SUPPLY OF SUBSEA CONTROL PANEL
M-63-00 Dec 16/02Jan 8/03SUPPLY OF COMPRESSOR SCRUBBERS
M-63-00 REISSUE Dec 31/02Jan 8/03SUPPLY OF COMPRESSOR SCRUBBERS
EOI-I-35-00 Dec 12/02Jan 9/03SUPPLY OF CONTROL & REGULATING VALVES, PRESSURE & D.P. TRANSMITTERS, TEMPERATURE TRANSMITTERS/ELEMENTS/WELLS, D.P. TYPE FLOW ELEMENTS & RESTRICTION ORIFICES
EOI-L-25-01 Dec 12/02Jan 9/03SUPPLY OF GATE VALVES (CS, SS, ALLOY, ETC.)
2003006PK Jan 17/03Jan 24/03INDOOR AIR QUALITY ASSESSMENT (IAQ)
2003005PK Jan 17/03Jan 27/03INDEPENDENT PROJECT RISK ASSESSMENT SERVICES
I-13-00 Dec 17/02Jan 29/03SUPPLY OF INSTRUMENT HOUSINGS / ENCLOSURES / MOUNTING STANDS / MANIFOLD / NEEDLE VALVES
2003007PK Jan 21/03Jan 30/03Marine Warranty Surveyor Services
EOI2002059PK Jan 23/03Feb 7/03SUPPLY OF: GLOBAL INSPECTION SERVICES
X-09-00 Jan 28/03Feb 12/03SUPPLY OF STRUCTURAL PASSIVE FIRE PROTECTION
EOI2003012PK Feb 6/03Feb 20/03PIPELINE SCOUR ASSESSMENT AND SEDIMENT TRANSPORT STUDY
EOI2003012PK Feb 6/03Feb 20/03PIPELINE SCOUR ASSESSMENT AND SEDIMENT TRANSPORT STUDY
M-12-00 Feb 12/03Feb 27/03SUPPLY OF SHELL AND TUBE HEAT EXCHANGERS
EOI 2003046 Apr 16/03Apr 25/03Newfoundland Exploration Drilling
EOI 2003047 Apr 16/03Apr 25/03Newfoundland Exploration Drilling
EOI 2003048 Apr 16/03Apr 25/03Newfoundland Exploration Drilling
EOI 2003049 Apr 16/03Apr 25/03Newfoundland Exploration Drilling
2003074 Jul 18/03Aug 1/032003074 Meteorological and Oceanographic Services BIDS Category: 9476, 9145,
EOI 2003 027 PK Jul 14/03Aug 5/03Category: 9300 Reference: EOI 2003027PK Issue Date: July 14, 2003 Closing
2003105 Aug 15/03Aug 21/03EOI Reference Number: 2003105
2003107 Aug 25/03Sep 2/03EOI Reference Number: 2003107

| Closed Expressions of Interest | Closed Tender Notices | Bidders Lists | Awards | Previous Page |


  back to terms and conditions


BIDS - Created: 2003/11/07 17:25:40