| EOI - ID | Issue Date | Close Date | Description
|
|---|
| REG. SUPPORT | Sep 11/00 | Sep 15/00 | Regulatory Submission Support for Potential Development Plan Application
|
| PCP-00-001 | Sep 1/00 | Sep 18/00 | Surface Wellhead System & Services
|
| PCP-00-002 | Sep 1/00 | Sep 18/00 | Liner Hanger Equipment & Services
|
| PCP-00-003 | Sep 1/00 | Sep 18/00 | Mudline Suspension Equipment & Services
|
| PCP-00-004 | Sep 1/00 | Sep 18/00 | Test String
|
| PCP-00-005 | Sep 1/00 | Sep 18/00 | Jack-up drilling rig
|
| PCP-00-006 | Sep 5/00 | Sep 18/00 | Cementing Unit, Chemicals & Services
|
| PCP-00-007 | Sep 1/00 | Sep 18/00 | Offshore supply base
|
| PCP-00-008 | Sep 1/00 | Sep 18/00 | Snubbing/Stripping Equipment & Services
|
| PCP-00-009 | Sep 5/00 | Sep 18/00 | Open Hole and Cased Hole Wireline Services
|
| PCP-00-010 | Sep 1/00 | Sep 18/00 | Mud Logging
|
| PCP-00-011 | Sep 5/00 | Sep 18/00 | Logging While Drilling ( LWD ) Services
|
| PCP-00-012 | Sep 1/00 | Sep 18/00 | MWD & Directional Drilling Services
|
| PCP-00-013 | Sep 1/00 | Sep 18/00 | Gyro Services
|
| PCP-00-014 | Sep 1/00 | Sep 18/00 | Drilling Fluid Supply & Services
|
| PCP-00-015 | Sep 1/00 | Sep 18/00 | Centrifuges & Services
|
| PCP-00-016 | Sep 1/00 | Sep 18/00 | Meteorological and oceanographic services
|
| PCP-00-017 | Sep 1/00 | Sep 18/00 | Breathing Air System
|
| PCP-00-018 | Sep 1/00 | Sep 18/00 | Helicopter services
|
| PCP-00-019 | Sep 1/00 | Sep 18/00 | Offshore support vessels
|
| PCP-00-020 | Sep 1/00 | Sep 18/00 | Subsea services
|
| PCP-00-021 | Sep 1/00 | Sep 18/00 | Tong Services
|
| PCP-00-022 | Sep 1/00 | Sep 18/00 | Fishing Services
|
| PCP-00-023 | Sep 1/00 | Sep 18/00 | Casing Accessories
|
| PCP-00-024 | Sep 1/00 | Sep 18/00 | Bucking Services
|
| PCP-00-025 | Sep 1/00 | Sep 18/00 | Tubular Inspection Service
|
| PCP-00-026 | Sep 1/00 | Sep 18/00 | Well Testing Equipment & Services
|
| PCP-00-027 | Sep 1/00 | Sep 18/00 | Subsurface Well Testing Equipment & Services
|
| PCP-00-028 | Sep 1/00 | Sep 18/00 | Metal fabrication
|
| PCP-00-029 | Sep 1/00 | Sep 18/00 | Medical services
|
| PCP-00-030 | Sep 1/00 | Sep 18/00 | Rig positioning services
|
| PCP-00-031 | Sep 1/00 | Sep 18/00 | Coring Equipment & Services
|
| PCP-00-032 | Sep 1/00 | Sep 18/00 | Storm Packers
|
| PCP-00-033 | Sep 1/00 | Sep 18/00 | Stevedoring services
|
| PCP-00-034 | Sep 1/00 | Sep 18/00 | Crane services
|
| PCP-00-035 | Sep 1/00 | Sep 18/00 | Waste disposal and recycling services
|
| PCP-00-036 | Sep 1/00 | Sep 18/00 | Trucking services - long distance
|
| PCP-00-037 | Sep 1/00 | Sep 18/00 | Trucking services - local
|
| PCP-00-039 | Sep 1/00 | Sep 18/00 | Offshore container services
|
| PCP-00-040 | Sep 1/00 | Sep 18/00 | Lifting gear inspection services
|
| PCP-00-041 | Sep 1/00 | Sep 18/00 | Petroleum products
|
| PCP-00-042 | Sep 1/00 | Sep 18/00 | Downhole Equipment Rental
|
| PCP-00-038 | Dec 4/00 | Dec 18/00 | Subsea wellsite survey services
|
| PCP-00-044 | Dec 4/00 | Dec 18/00 | Household Waste Disposal Services
|
| PCP-00-045 | Dec 4/00 | Dec 18/00 | Hazardous Waste Disposal Services
|
| PCP-00-046 | Dec 4/00 | Dec 18/00 | Scrap wire, cable, and metal disposal services
|
| PCP-00-047 | Dec 4/00 | Dec 18/00 | Vacuum truck services
|
| PCP-2001040 | Mar 6/01 | Mar 12/01 | Scaffolding Equipment and Services
|
| PCP-2001028 | Mar 6/01 | Mar 13/01 | Tubular Running Services
|
| PCP-2001029 | Mar 6/01 | Mar 13/01 | Rig Inspection Services
|
| PCP-2001033 | Mar 6/01 | Mar 13/01 | Threading Services
|
| PCP-2001043 | Mar 6/01 | Mar 13/01 | Threading Inspection Services
|
| EOI-2001-041 | Mar 5/01 | Mar 16/01 | Office Furniture
|
| EOI2001038 | Feb 23/01 | Mar 16/01 | EOI Reference Number: EOI 2001038
|
| PCP-2001056 | Mar 23/01 | Mar 30/01 | EOI Reference Number: PCP-2001056
|
| 2001058 | Mar 26/01 | Apr 2/01 | EOI Reference Number: 2001058
|
| 2001070 | Apr 27/01 | May 5/01 | EOI Reference Number: 2001070
|
| PCP 2001-071 | Apr 30/01 | May 14/01 | Ship Agency and Custom Brokerage
|
| EOI2001074 | May 10/01 | May 24/01 | EOI Reference Number: EOI2001074
|
| PCP-2001080 | May 29/01 | Jun 11/01 | Tubular Management Services
|
| PCP-2001087 | Jun 6/01 | Jun 14/01 | Subsea Wellhead System and Services
|
| 2001089 | Jun 1/01 | Jun 15/01 | EOI Reference Number: 2001089
|
| 2001095 | Jun 14/01 | Jun 28/01 | EOI Reference Number: 2001095
|
| 2001098 | Jun 18/01 | Jun 29/01 | EOI Reference Number: 2001098
|
| 2001093 | Jul 3/01 | Jul 12/01 | EOI Reference Number: 2001093
|
| 2001103 | Jul 11/01 | Jul 25/01 | Automation Systems - Deep Panuke Project
|
| 2001107 | Aug 3/01 | Aug 16/01 | Rig Inspection Services
|
| 2001119 | Sep 28/01 | Oct 12/01 | EOI Reference Number: 2001119
|
| EOI-2001-124 | Oct 17/01 | Oct 31/01 | Fork Lift Trucks
|
| 2001130 | Oct 23/01 | Nov 2/01 | EOI Reference Number: 2001130
|
| EOI-2001-133 | Nov 8/01 | Nov 22/01 | Helicopter Fuel Storage and Pumping Unit - Sable Island
|
| N2001001 | Nov 27/01 | Dec 4/01 | BIDS Categories: 9476, 9145, 8965, 8967
|
| 2001141 | Dec 4/01 | Dec 18/01 | EOI Reference Number: 2001141
|
| 2001130 | Oct 23/01 | Jan 4/02 | EOI Reference Number: 2001130
|
| 2002010PK | Feb 22/02 | Mar 8/02 | EOI Reference Number: 2002010PK
|
| 2002016 | Feb 26/02 | Mar 12/02 | EOI Reference Number: 2002016
|
| EOI-M-01-00 | Mar 11/02 | Mar 23/02 | SUPPLY OF GAS TURBINE DRIVEN CENTRIFUGAL COMPRESSORS FOR EXPORT AND FEED GAS
|
| EOI-M-02-00 | Mar 11/02 | Mar 23/02 | SUPPLY OF COMPRESSORS-ACID GAS SYSTEM
|
| EOI-M-14-00 | Mar 11/02 | Mar 23/02 | SUPPLY OF GAS TURBINE POWER GENERATION PACKAGES
|
| EOI-M-20-01 | Mar 11/02 | Mar 23/02 | SUPPLY OF AMINE CONTACTOR
|
| EOI-M-32-01 | Mar 11/02 | Mar 23/02 | SUPPLY OF TEG CONTACTOR
|
| EOI-M-48-00 | Mar 11/02 | Mar 23/02 | SUPPLY OF ELECTRICALLY-DRIVEN SUBMERSIBLE SEAWATER LIFT PUMPS
|
| EOI-M-54-00 | Mar 11/02 | Mar 23/02 | SUPPLY OF FIRE WATER PUMP SYSTEM
|
| EOI-S-03-00 | Mar 11/02 | Mar 23/02 | SUPPLY OF MAJOR DECK STEEL
|
| EOI-E-02-01 | Mar 12/02 | Mar 27/02 | SUPPLY OF CABLE GLANDS
|
| EOI-L-08-00 | Mar 12/02 | Mar 27/02 | SUPPLY OF MECHANICAL TYPE CONNECTORS
|
| EOI-M-03-00 | Mar 12/02 | Mar 27/02 | SUPPLY OF CONDENSATE STABILIZER OVERHEAD COMPRESSOR
|
| 2002022 | Mar 14/02 | Mar 28/02 | EOI Reference Number: 2002022
|
| 2002024PK | Mar 15/02 | Mar 29/02 | EOI Reference Number: 2002024PK
|
| EOI2002027PK | Mar 22/02 | Mar 29/02 | GEOTECHNICAL & GEOPHYSICAL INVESTIGATION
|
| EOI-M-44-00 | Mar 15/02 | Apr 5/02 | SUPPLY OF PEDESTAL CRANES
|
| EOI-E-07-01 | Mar 22/02 | Apr 9/02 | SUPPLY OF JUNCTION BOXES
|
| EOI-I-14-00 | Mar 22/02 | Apr 9/02 | SUPPLY OF INSTRUMENT TUBING, HEAT TRACED TUBE BUNDLES, AND TUBE FITTINGS
|
| EOI-E-12-00 | May 9/02 | May 24/02 | SUPPLY OF: Power Switchgear, MCC's, Transformers and Panelboards
|
| M-38-00 | May 17/02 | Jun 3/02 | SUPPLY OF Plant/Instrument Air Compressor(s) Package w/Dryer
|
| EOI-L-03-00 | May 22/02 | Jun 6/02 | SUPPLY OF "Alloy and Clad Pipe, Fittings and Flanges"
|
| EOI-M-53-00 | May 24/02 | Jun 6/02 | SUPPLY OF ELECTRICALLY - DRIVEN CENTRIFUGAL PUMPS
|
| EOI-L-02-00 | May 24/02 | Jun 10/02 | SUPPLY OF "Stainless Steel Pipe, Fittings and Flanges"
|
| EOI-M-56-00 | May 28/02 | Jun 10/02 | SUPPLY OF ELECTRICALLY - DRIVEN VERTICAL SUMP PUMPS
|
| EOI-2002-144PK | Jun 3/02 | Jun 14/02 | SUPPLY OF: WELLHEAD PLATFORM JACKET FABRICATION
|
| EOI-E-08-00 | Jun 3/02 | Jun 14/02 | SUPPLY OF Electrical Heat Tracing Systems
|
| EOI-L-01-00 | Jun 3/02 | Jun 17/02 | SUPPLY OF "CARBON STEEL PIPE, FLANGES & FITTINGS"
|
| EOI-M-07-00 | Jun 3/02 | Jun 17/02 | SUPPLY OF "EXCHANGERS-PCHE-PRINTED CIRCUIT BOARD"
|
| EOI-M-20-02 | Jun 3/02 | Jun 17/02 | SUPPLY OF "Amine Gas Sweetening System"
|
| EOI-M-21-00 | Jun 3/02 | Jun 17/02 | SUPPLY OF CHEMICAL INJECTION PACKAGE
|
| EOI-M-32-02 | Jun 3/02 | Jun 17/02 | SUPPLY OF "TEG REGENERATION SYSTEM"
|
| EOI-M-47-00 | Jun 3/02 | Jun 17/02 | SUPPLY OF "Produced Water Treatment System"
|
| EOI-M-52-00 | Jun 4/02 | Jun 18/02 | SUPPLY OF ELECTRICALLY DRIVEN STABILIZED CONDENSATE RE-INJECTION PUMPS
|
| EOI-M-55-00 | Jun 4/02 | Jun 18/02 | SUPPLY OF ELECTRICALLY DRIVEN POSITIVE DISPLACEMENT PUMPS
|
| EOI2002041PK | Jun 4/02 | Jun 18/02 | SUPPLY OF: WELLHEAD PLATFORM TOPSIDES FABRICATION
|
| S-02-00/S-04-00 | Jun 4/02 | Jun 19/02 | SUPPLY OF JACKET PILES AND WELDED TUBULARS & CONES
|
| S-08-00 | Jun 6/02 | Jun 21/02 | SUPPLY OF STRUCTURAL ROLLED SECTIONS & SEAMLESS TUBULARS
|
| EOI-M-27-00 | Jun 11/02 | Jun 24/02 | SUPPLY OF Hypochlorite Generation Package
|
| EOI M-42-00 | Jun 12/02 | Jun 26/02 | SUPPLY OF INERT GAS GENERATION PACKAGE
|
| EOI-I-37-00 | Jun 13/02 | Jun 27/02 | SUPPLY OF I-37-00 - SUPPLY OF ON-OFF VALVES & SAFETY SHUT-OFF VALVES
|
| EOI-M-48-02 | Jun 13/02 | Jun 28/02 | SUPPLY OF "SEAWATER FILTRATION SYSTEM"
|
| EOI-M-30-00 | Jun 24/02 | Jul 5/02 | SUPPLY OF Fuel Gas Package
|
| EOI C2002115PK | Jun 24/02 | Jul 8/02 | SUPPLY OF: REPROGRAPHIC SERVICES
|
| EOI-L-15-00 | Jun 25/02 | Jul 8/02 | SUPPLY OF PRODUCTION AND TEST MANIFOLDS
|
| EOI U-04-00 | Jul 3/02 | Jul 17/02 | SUPPLY OF 24" SUBSEA ISOLATION VALVE (SSIV)
|
| EOI2002040PK | Jul 10/02 | Jul 26/02 | SUPPLY OF: UTILITY & QUARTERS PLATFORM TOPSIDES DESIGN & FABRICATION
|
| EOI2002043PK | Jul 10/02 | Jul 26/02 | SUPPLY OF: PRODUCTION PLATFORM JACKET FABRICATION
|
| EOI2002044PK | Jul 10/02 | Jul 26/02 | SUPPLY OF: UTILITIES AND QUARTERS PLATFORM JACKET FABRICATION
|
| EOI 2002156 | Jul 24/02 | Jul 30/02 | Description: Geotechnical Testing
|
| 2002118PK | Jul 22/02 | Jul 31/02 | SUPPLY OF PROJECT MANAGEMENT SYSTEM
|
| 2002155 | Jul 17/02 | Aug 2/02 | EOI Reference Number: 2002155
|
| EOI2002042PK | Jul 19/02 | Aug 5/02 | SUPPLY OF: PRODUCTION PLATFORM TOPSIDES FABRICATION
|
| EOI-2002051 | Aug 8/02 | Aug 21/02 | SUPPLY OF: FLAREBOOM FABRICATION
|
| EOI2002052 | Aug 8/02 | Aug 21/02 | SUPPLY OF: BRIDGE FABRICATION
|
| 2002162 | Aug 21/02 | Sep 4/02 | EOI Reference Number: 2002162
|
| EOI 2002167 | Sep 11/02 | Sep 20/02 | EOI Reference Number: EOI 2002167
|
| EOI2002039PK | Sep 10/02 | Sep 24/02 | Transport & Installation (T&I)
|
| S-09-00 | Sep 9/02 | Sep 24/02 | SUPPLY OF STRUCTURAL STEEL CASTINGS
|
| EOI2002038PK | Sep 13/02 | Sep 27/02 | Offshore Pipelay
|
| EOI2002..... | Oct 3/02 | Oct 17/02 | SUPPLY OF: JACKET FABRICATION PRODUCTION PLATFORM, WELLHEAD PLATFORM AND UTILITIES AND QUARTERS PLATFORM
|
| EOI2002040PK-A | Oct 3/02 | Oct 17/02 | SUPPLY OF: UTILITY & QUARTERS PLATFORM TOPSIDES DESIGN & FABRICATION
|
| EOI2002041PK-A | Oct 3/02 | Oct 17/02 | SUPPLY OF: WELLHEAD PLATFORM TOPSIDES FABRICATION
|
| EOI2002042PK-A | Oct 3/02 | Oct 17/02 | SUPPLY OF: PRODUCTION PLATFORM TOPSIDES FABRICATION
|
| EOI2002127PK | Oct 4/02 | Oct 18/02 | SUPPLY OF: FLOW METERING SERVICES - DESIGN
|
| EOI - L-23-00 | Oct 4/02 | Oct 21/02 | SUPPLY OF VALVES - BALL, METAL AND SOFT SEATED
|
| EOI - L-24-00 | Oct 4/02 | Oct 21/02 | SUPPLY OF VALVES - BUTTERFLY
|
| EOI-L-37-00 | Oct 21/02 | Nov 4/02 | SUPPLY OF CLAD/OVERLAY PIPE, FLANGES & FITTINGS
|
| EOI-L-30-00 | Oct 25/02 | Nov 12/02 | SUPPLY OF VALVES - SAFETY RELIEF (PSV's)
|
| EOI-L-25-02 | Oct 29/02 | Nov 14/02 | SUPPLY OF GLOBE VALVES (CS, SS, ALLOY, ETC.)
|
| EOI-L-25-03 | Oct 29/02 | Nov 14/02 | SUPPLY OF CHECK VALVES (CS, SS, ALLOY, ETC.)
|
| EOI-L-25-04 | Oct 29/02 | Nov 14/02 | SUPPLY OF NON-SLAM CHECK VALVES
|
| 2002-211 | Nov 8/02 | Nov 22/02 | EOI Reference: 2002-211
|
| M-62-00 | Nov 12/02 | Nov 25/02 | SUPPLY OF PRODUCTION SEPARATORS
|
| EOI2002181PK | Nov 15/02 | Nov 28/02 | SUPPLY OF: SIL STUDY SERVICES FOR SIS- DESIGN
|
| L-27-00 | Nov 15/02 | Nov 29/02 | SUPPLY OF Double Block and Bleed Valves
|
| B-03-00 | Nov 15/02 | Dec 2/02 | SUPPLY OF CUSTOMS CONSULTANT
|
| B-04-00 | Nov 15/02 | Dec 2/02 | SUPPLY OF CUSTOMS BROKERAGE
|
| B-01-00 | Nov 15/02 | Dec 3/02 | SUPPLY OF FREIGHT FORWARDING - DOMESTIC NORTH AMERICA
|
| B-02-00 | Nov 15/02 | Dec 3/02 | SUPPLY OF FREIGHT FORWARDING - INTERNATIONAL
|
| EOI-L-06-00 | Nov 19/02 | Dec 4/02 | SUPPLY OF STUDBOLTING / NUTS / WASHERS /CAPSCREWS
|
| EOI-I-32-00 | Nov 28/02 | Dec 12/02 | SUPPLY OF WELLHEAD HYDRAULIC CONTROL PANEL
|
| EOI-I-44-00 | Nov 28/02 | Dec 12/02 | SUPPLY OF SUBSEA CONTROL PANEL
|
| M-63-00 | Dec 16/02 | Jan 8/03 | SUPPLY OF COMPRESSOR SCRUBBERS
|
| M-63-00 REISSUE | Dec 31/02 | Jan 8/03 | SUPPLY OF COMPRESSOR SCRUBBERS
|
| EOI-I-35-00 | Dec 12/02 | Jan 9/03 | SUPPLY OF CONTROL & REGULATING VALVES, PRESSURE & D.P. TRANSMITTERS, TEMPERATURE TRANSMITTERS/ELEMENTS/WELLS, D.P. TYPE FLOW ELEMENTS & RESTRICTION ORIFICES
|
| EOI-L-25-01 | Dec 12/02 | Jan 9/03 | SUPPLY OF GATE VALVES (CS, SS, ALLOY, ETC.)
|
| 2003006PK | Jan 17/03 | Jan 24/03 | INDOOR AIR QUALITY ASSESSMENT (IAQ)
|
| 2003005PK | Jan 17/03 | Jan 27/03 | INDEPENDENT PROJECT RISK ASSESSMENT SERVICES
|
| I-13-00 | Dec 17/02 | Jan 29/03 | SUPPLY OF INSTRUMENT HOUSINGS / ENCLOSURES / MOUNTING STANDS / MANIFOLD / NEEDLE VALVES
|
| 2003007PK | Jan 21/03 | Jan 30/03 | Marine Warranty Surveyor Services
|
| EOI2002059PK | Jan 23/03 | Feb 7/03 | SUPPLY OF: GLOBAL INSPECTION SERVICES
|
| X-09-00 | Jan 28/03 | Feb 12/03 | SUPPLY OF STRUCTURAL PASSIVE FIRE PROTECTION
|
| EOI2003012PK | Feb 6/03 | Feb 20/03 | PIPELINE SCOUR ASSESSMENT AND SEDIMENT TRANSPORT STUDY
|
| EOI2003012PK | Feb 6/03 | Feb 20/03 | PIPELINE SCOUR ASSESSMENT AND SEDIMENT TRANSPORT STUDY
|
| M-12-00 | Feb 12/03 | Feb 27/03 | SUPPLY OF SHELL AND TUBE HEAT EXCHANGERS
|
| EOI 2003046 | Apr 16/03 | Apr 25/03 | Newfoundland Exploration Drilling
|
| EOI 2003047 | Apr 16/03 | Apr 25/03 | Newfoundland Exploration Drilling
|
| EOI 2003048 | Apr 16/03 | Apr 25/03 | Newfoundland Exploration Drilling
|
| EOI 2003049 | Apr 16/03 | Apr 25/03 | Newfoundland Exploration Drilling
|
| 2003074 | Jul 18/03 | Aug 1/03 | 2003074 Meteorological and Oceanographic Services BIDS Category: 9476, 9145,
|
| EOI 2003 027 PK | Jul 14/03 | Aug 5/03 | Category: 9300 Reference: EOI 2003027PK Issue Date: July 14, 2003 Closing
|
| 2003105 | Aug 15/03 | Aug 21/03 | EOI Reference Number: 2003105
|
| 2003107 | Aug 25/03 | Sep 2/03 | EOI Reference Number: 2003107
|